Cement, Energy and Environment

Implementa on of Plan Trial taken: A complete trial was carried out in the Second week of Aug 2018, and since then the system has been running smoothly. External Party: M/s Annant Anersol Pvt ltd., Kota, provided materials and an engineer to work with the JKWCW team. Problems during Implementa on: 1. In remote zone project we have very limited op ons to execute our project. We had faced room size issue. We wanted to mount our solar panel on roo op of the room, but room's roo op area is not up to our requirements. 2. We installed solar panel on ground. 3. There are unwanted movements of ca les. Fencing required for solar panels to prevent solar panel from unwanted damages. 4. Individual earth pits were needed for the UPS and solar system, which were arranged. 5. A founda on was required to install the solar panels. 6. Cost 7. Space availability, material transporta on, cleaning of solar panels, daily genera on, return on investment and sensi vity analyses to take into account fluctua ons in energy costs are some issues which need monitoring. Fishbone Diagram for Inden fying the root cause 85

RkJQdWJsaXNoZXIy MTYwNzYz