Cement, Energy and Environment

76 Figure 1: Fishbone diagram for iden fying the root cause of increase in power consump on of cement mill 3 Figure 2: Implementa on plan to increase the capacity and to reduce the specific power consump on of cement mill 3 S.No. Action Plan of Cement Mill-3 Improvements Jul-13 Jul-13 Aug-13 Dec-13 May- 14 Sep-14 Mar-15 1 Grinding media pattern changed. 2 Grinding media lling level increased. 3 Crash stop analysis of mill sample. 4 Nib’s separator installed at mill outlet for nibs separation. 5 DBC installed for clinker hopper lling. 6 Evaluation of Improvements carried out in Cement Mill-3 7 Observation and monitoring for consistency of results