Cement, Energy and Environment
8. Financial Implica ons: Expenses incurred for SMART Kiln Posi oning System: 2.30 Lakh Expenses incurred for modified Kiln displacement assembly: 0.36 Lakh 9. Impacts and Benefits: · Kiln Migra on measurement range increased from +/-15mm to +/- 50mm. · Par cular kiln posi on feedback is available at CCR SCADA display with analog values so that CCR operator can see the displacement of Kiln Online and give the feedback to concerned department within me frame · New Ultrasonic measuring principle based transmi er has zero maintenance, special lever operated limit switches were used in earlier equipment. · Easy to configure and Range calibra on through laptop so ware. 99
Made with FlippingBook
RkJQdWJsaXNoZXIy MTYwNzYz