Cement, Energy and Environment

for kiln posi on feedback in case of Ultrasonic transmi er failure. · Water cooling system installed for cold water circula on through jacket. · Water cooling jacket and water circula ng lines start ge ng coated by alkaline water, which were crea ng lines choking problem. To overcome this very small volume air (of 1 Litre/min. flow) from Air condi oned panel room circulated around Ultrasonic transmi er. 6.Photograph of team who have executed the project: From le to right- Mr. Rahul Dwivedi, Mr. Om Prakash Gurjar, Mr. Lokesh Verma 7. Photograph a. Ini al model drawing prepared: 97

RkJQdWJsaXNoZXIy MTYwNzYz