46 electrical & instrumentation should be present. Meeting agenda essentially covers following  Progress of Design Engineering Work. Plan versus Actual.  Progress of Civil Construction Work. Plan versus Actual.  Progress Structural Fabrication & Erection Work. Plan versus Actual.  Progress of Equipment Manufacturing. o Quality Assurance Plan & Inspection Schedule. o Equipment Delivery Schedule.  Progress of Mechanical Erection Work. Plan versus Actual.  Progress of Electrical / Instrumentation & Automation Work. Plan versus Actual. Pictorial representation of Civil Progress Work is always vivid for understanding. 9. Project Manpower 10. Safety Safety in Project Execution is the most important of all factors. Numerous activities take place simultaneously and a project will be said to be most efficiently managed when no incident or fatality takes place. Each contractor must have their own safety officer and should sign safety pledge. 11. Concrete Mix Design Testing Laboratory Concrete Mix Design is made available by the Design Consultant for the foundations, different buildings, Storage Silo, auxiliary buildings. To ensure that the construction is done as per the quality specified by the designer, it is necessary to have concrete mix design testing laboratory at site which is set up by the Civil Contractor and the contractor submits test report of each batch o f mix design to the Civil In charge of the Project Team for checking and approval. 12. Bill of Quantity Before execution, when GA drawings is done, estimation / preparation of Bill of Materials is very important. It is a yard stick to arrange construction materials in time, measure progress and have control over contractors as well as plan action to make up shortfall. Typical Bill of Quantity (BOQ) for 6500 / 7500 TPD clinker & 10,000 TPD cement grinding plant is shown here, however, it will depend upon soil testing, design & layout on case to case basis.

RkJQdWJsaXNoZXIy MTYwNzYz