62 Figure 4: EMS system – Reports page Configuration of Advance Reporting System Auto generation of reports Alarms, Events and Trends configuration For analysis of various parameters, Sag/Swell, transients in case of any Fluctuation of grid voltage because of any reason Advance reporting system Was configured which enables us to analyse the data and fetch trends accurately and precisely. EMS apart from monitoring data also provides us auto generated reports. Through EMS we configured various reports such as Daily power consumption report, Environment report, solar generation report, Hourly kW data, detailed report through which consumption of any meter can be generated for a given time interval. For each parameter trends were configured for real time analysis of any Parameter. Trends of all the parameters are available by clicking on the value Displayed. Also, various alarms were configured. • For Power Factor less than 0.95 of 132KV I/C CM3350 with a time delay of 5minutes. • For NDS ICOG & DS ICOG MDI cross i.e. 675KVA • For Power Factor of DS & NDS less than 0.95 with time delay of 5 minutes • In case of underdrawal i.e. Load (KW) on 132KV I/C is less than Bidding Approved X 0.06(losses). • In case of any breaker gets switched off because of load shedding then a Pop Up will generate. • In Case MDI crosses as per bidding sheet. • In case of DS & NDS voltage less than 3135V & greater than 3465V.

RkJQdWJsaXNoZXIy MTYwNzYz